Full PUR athletics system · manufacturer direct · German raw materials · global supply

Full PU Running Track System Manufacturer & Materials Supplier

A Full PU running track system (also called Full PUR or full-pour polyurethane athletics surfacing) is a seamless, poured-in-place track built with multiple dense polyurethane-rich layers and a textured wearing surface. Sport Floor manufactures and supplies compatible PU sports-flooring materials and coordinates rubber granules for professional track projects and international B2B buyers.

Unlike a spray-coat track, the full-pour approach relies on substantial liquid polyurethane layers rather than a porous rubber mat with a thin sprayed finish. A project-specific assembly may use primer, resilient PU layers with selected granules, a dense PU wear layer and embedded EPDM texture. The approved specification controls the actual sequence.

Sport Floor manufactures its own polyurethane sports-flooring materials, uses system materials within its project activity and supplies them directly for international orders. German raw materials are used within applicable Sport Floor formulations, creating a strong material-quality foundation for demanding running-track projects.

Full PU Running TrackFull PUR Track SystemPolyurethane Athletics Track PU Track MaterialsEPDM Track SurfaceGerman Raw Materials Manufacturer DirectInternational Supply
Sport Floor ManufacturedCore polyurethane components are part of the Sport Floor sports-flooring product family.
German Raw MaterialsGerman raw materials are used within applicable Sport Floor polyurethane formulations.
System + Material SupplyBuy coordinated materials rather than unrelated track chemicals from multiple suppliers.
International B2B SupplyFor contractors, distributors, importers, consultants and project procurement.
Full PU running track — at a glance

Full PUR track system: construction, materials and purchasing essentials

A concise technical overview for athletics consultants, stadium developers, track installers and international procurement teams.

What it is

A seamless, in-situ, polyurethane-rich athletics surface. The construction is typically dense and uses multiple poured layers rather than a thin sprayed topcoat.

What you buy

Compatible primer, specified PU materials, selected SBR or EPDM granules, surface finishing and marking products, supported by project-specific documentation.

What must be verified

Approved system thickness, test performance, product compatibility, base moisture, material consumption, application climate and any required certification.

What is a Full PU running track?

A polyurethane-rich athletics surface built as a dense, multi-layer track system

Full PU, also referred to internationally as Full PUR or full-pour polyurethane track surfacing, is a synthetic athletics-track system in which the principal resilient and wearing layers are created with polyurethane materials rather than relying on a porous rubber base finished only by a thin spray coat.

A typical concept begins with a correctly constructed asphalt or concrete track base and compatible primer. Dense polyurethane layers are then installed in sequence, commonly with rubber granules incorporated or broadcast according to the system design. The exposed wearing surface is completed with a compatible polyurethane layer and EPDM granules where specified.

The result is a continuous track surface designed for professional athletics use. Exact system thickness, granule size, material consumption, layer count and performance values must be selected from the actual project requirements and current Sport Floor technical documentation.

Dense polyurethane system rather than a thin spray-only finishing route.
Suitable for professional athletics-track projects where a Full PU specification is required.
Uses coordinated primer, PU layers and compatible rubber granules.
Can be supplied as a coordinated material package for installation contractors.
German raw materials used within applicable Sport Floor PU formulations.
Available for domestic projects and international B2B supply.
Sport Floor Full PU running track system materials for athletics tracks
How the system is built

From prepared base to the final athletics wearing surface

The exact build-up depends on the selected Sport Floor system and project specification, but Full PU tracks follow a dense polyurethane layer logic.

01

Prepared Base

Correct civil works, levels, falls, compaction and asphalt/concrete quality create the foundation for the track surface.

02

Compatible Primer

The selected Sport Floor primer creates the required interface between the prepared base and the polyurethane build-up.

03

Dense PU Layers

One or more polyurethane layers are installed according to the selected full-pour system and may incorporate or receive SBR granules.

04

Final Wearing Surface

The exposed running surface is completed with the specified PU layer and EPDM granules or compatible finish before line marking.

Controlled installation

Full PU performance starts with base quality and layer-by-layer control

Full PU systems depend on a stable, correctly prepared base. Surface levels, drainage, substrate soundness and primer compatibility should be confirmed before polyurethane installation begins.

Each polyurethane layer should be installed within the current technical limits for the supplied material. Mixing, consumption, working time, cure interval and granule application are product-specific and should not be copied from another manufacturer's system.

For international contractors, Sport Floor can supply the required polyurethane products and rubber materials as a coordinated package, supported by current product documentation and project-specific material planning.

Applying Sport Floor Full PU running track system layers
Do not build a Full PU track from generic layer values Thickness, consumption, mixing ratio, cure time and rubber specification should come from the selected Sport Floor system and current technical documents.
Conceptual layer sequence

Primer → dense PU layers → EPDM / PU wearing surface

Published Full PUR examples from established manufacturers show layered poured-polyurethane construction and a granule-textured wearing course. Polytan describes a solid, waterproof PUR surface with EPDM embedded in the wear layer; Rekortan literature describes a base, force-reduction and wear-layer concept. These are industry references, not Sport Floor product specifications.

Sport Floor follows the same system logic while selecting the actual primer, PU products, rubber granules and layer configuration around the project, climate, base condition and commercial specification.

The diagram is conceptual, not a fixed bill of quantities. Some projects may require different layer sequencing or additional preparation depending on the selected specification.

Full PU running track system layer build up with primer PU layers SBR and EPDM
Why choose Full PU?

A premium track-system route for projects prioritizing dense polyurethane construction

01

Dense System Build-Up

The principal resilient and wearing layers are created through polyurethane-rich construction rather than a thin sprayed finish.

02

Seamless In-Situ Surface

PU layers are installed on site to create a continuous track system over the correctly prepared base.

03

System Control

Primer, PU layers, rubber granules and line-marking products can be coordinated within one material package.

04

Professional Athletics Use

Full PUR is an established international running-track system category used in professional athletics surfacing.

05

Color & Surface Design

EPDM and compatible colored PU materials allow project-specific surface and marking design where supported by the selected system.

06

Material Package Supply

Sport Floor can supply the core PU and rubber materials to contractors building Full PU tracks in international markets.

German raw-material advantage

Full PU systems place more responsibility on the polyurethane formulation itself

Because the system relies heavily on polyurethane layers, raw-material selection and compatibility become especially important.

01

German Raw Materials

Sport Floor uses German raw materials within applicable polyurethane formulations used across its sports-flooring product family.

02

Own PU Product Family

Sport Floor manufactures primers, binders, self-leveling PU, sealers, top coats, line marking and related products used around sports-floor systems.

03

Manufacturer + Installer + Exporter

Sport Floor combines material manufacturing, project use and direct international supply rather than acting only as a trading intermediary.

Full PU vs Sandwich vs Spray Coat

Choose the track system by construction logic, performance target and project budget

Selection pointFull PUSandwichSpray Coat
Core build-upPolyurethane-rich dense layers with rubber granules incorporated/embedded according to system design.Resilient SBR/rubber base, pore-sealed, then dense PU wearing layer.Porous rubber base finished with a sprayed PU/EPDM coating.
Surface structureDense / non-porous concept depending on system.Dense upper PU surface over resilient rubber base.More open/porous construction depending on selected system.
PU material intensityHighest of the three typical in-situ families.Medium to high.Lower than Full PU because the sprayed finish is thinner.
Typical commercial positioningPremium athletics-track route.Balanced performance and material efficiency.Economical/training-oriented route where suitable.
Dedicated pageCurrent systemSandwich Running Track SystemSpray Coat Running Track System
System choice should be project-specific. Final selection should consider intended athletics use, budget, climate, base construction, drainage approach, required certification pathway and maintenance strategy.
World Athletics context

Full PUR is an established international track-surface category

World Athletics' published certified track-surfacing lists include products categorized under several system descriptions including Full PUR, Sandwich, Spray Coat and Prefabricated. These descriptions identify construction families; they do not certify a supplier or a generic system name.

However, a system category and a certified product are not the same thing. A track should only be described as using a World Athletics-certified Sport Floor product if the exact Sport Floor surfacing product has a valid certificate for the specified configuration.

For projects pursuing World Athletics facility certification, the surface product, installed thickness, facility geometry, construction quality and testing route should all follow the current World Athletics requirements and project consultant specification.

Important: This page does not claim that the Sport Floor Full PU system currently holds a World Athletics Product Certificate. Certification claims should only be made using current, product-specific evidence.
System materials

Source the Full PU track as a coordinated material package

01

PU Primer

Selected around asphalt/concrete base and project environment.

02

Dense PU Layers

Compatible self-leveling or track-specific polyurethane materials according to the selected build-up.

03

SBR & EPDM Granules

Rubber components selected around system layer, color, exposure and project specification.

04

Marking & Finishing

Compatible line marking and related finishing materials for the completed athletics surface.

Who buys Full PU materials?

Built for professional B2B athletics projects

01

Running-Track Contractors

Contractors installing complete track systems and requiring coordinated PU and rubber materials.

02

Sports Construction Companies

Companies delivering stadium, school, club and athletics-facility projects.

03

Distributors & Importers

Buyers building local product availability for running-track and sports-flooring contractors.

04

Consultants & Procurement

Teams comparing system build-ups, technical documents, BOQs and international material supply.

Base construction matters

A premium surface cannot compensate for a poor running-track base

01

Levels & Geometry

The civil base must follow the designed track geometry, falls and facility layout before surfacing begins.

02

Drainage

Water-management strategy should be resolved in the civil design rather than relying on the PU surface to correct drainage problems.

03

Base Stability

Asphalt or concrete should be sound, properly prepared and suitable for the selected polyurethane interface.

Installation workflow

From approved base to finished athletics track

01

Inspect the Base

Confirm geometry, levels, drainage, soundness and surface readiness.

02

Prime

Apply the compatible Sport Floor primer for the selected base and environment.

03

Install PU Layers

Build the specified dense polyurethane layers and integrate/broadcast rubber granules as required.

04

Finish & Mark

Complete the wearing surface, cure correctly and apply the approved athletics markings.

Technical data

Specify the system from current Sport Floor technical documentation

Full PU systems are layer-dependent. Exact values must come from the selected system rather than from generic competitor specifications.

ItemSport Floor Full PU SystemWhy it matters
System TypeFull PU / Full PUR in-situ running-track system.Defines the commercial and technical system family.
BasePrepared compatible asphalt or concrete according to project specification.Controls surface stability and long-term track behavior.
PrimerSelected Sport Floor primer according to base and environment.Creates the interface to the PU system.
PU LayersDense polyurethane layers selected for the approved Full PU build-up.Core of the system.
Rubber GranulesSBR and/or EPDM as required by the selected layer configuration.Contributes to resilience, surface texture and final appearance.
ThicknessProject-specific; use current Sport Floor system documentation.Critical to specification and material quantity.
ConsumptionCalculated from selected layer thickness and current product data.Required for accurate BOQ and export quantities.
Mix Ratio / CureFollow current TDS for each supplied PU product.Controls installation quality.
Climate / Application LimitsFollow current Sport Floor product documentation.Important for international projects.
CertificationOnly claim product/facility certification when supported by current project-specific documentation.Prevents unsupported compliance claims.
DocumentsTDS, SDS, packing and available supporting documents can be requested.Supports contractor, consultant and import approval.
Common specification mistakes

Full PU is a system — not a single layer or a product name

01

Ignoring the Base

Track surfacing cannot correct unstable civil work, poor geometry or drainage defects.

02

Copying a Competitor's Thickness

Layer thickness and sequence should follow the selected Sport Floor system and project requirement.

03

Mixing Unrelated Products

Using primers, PU layers and granules without compatibility review can create system risk.

04

Calling Spray Coat “Full PU”

These are different internationally recognized system families with different construction logic.

05

Assuming Certification

World Athletics certification belongs to specific products/facilities and must be supported by current evidence.

06

Ordering by Area Only

Accurate material quantities require system build-up, thickness, base condition and project specification.

Engineering and procurement checklist

How to evaluate a Full PU athletics track before approving the system

Published competitor specifications can help you compare concepts, but a purchasing decision requires documented values for the exact proposed Sport Floor system.

01 — Surface performance

Request independent test evidence for force reduction, vertical deformation, friction, tensile properties, weathering and spike-related wear as relevant to the project specification.

02 — Design thickness

Define target and minimum installed thickness in the consultant-approved system. Do not copy 13 mm, 15 mm or 17 mm from an unrelated certified product.

03 — Layer-by-layer BOQ

Confirm the named primer, each PU component, SBR/EPDM grading, estimated kg/m², waste allowance and packaging quantities before quoting.

04 — Climate and base

Check substrate condition, moisture limits, ambient temperature, humidity, pot life, curing time and drainage requirements from the relevant TDS.

05 — Documentation

Ask for current TDS and SDS, system build-up, material compatibility confirmation, available test reports, packing information and country-specific export documents.

06 — Certification pathway

If World Athletics certification is required, confirm the exact listed product, certification number and absolute thickness. Facility certification is a separate project-level process.

Published industry references

Full PUR technical references and independent verification

These references help buyers distinguish a recognized surface category from a certified product. They do not establish certification or performance figures for Sport Floor.

World Athletics product list

The official certified track-surfacing list identifies products described as Full PUR, Sandwich and Spray Coat, with product-specific absolute thicknesses and certificate numbers.

Consult the official list

Polytan Rekortan PUR

Polytan describes a solid, waterproof layered polyurethane track with embedded EPDM wear texture. Its documented system is a market reference, not a Sport Floor specification.

View manufacturer reference

Rekortan system engineering

Rekortan's published brochure illustrates base, force-reduction and wearing layers, highlighting why a technical layer drawing is valuable for purchasing decisions.

Review the technical brochure
Manufacturer + installer + exporter

Buy Full PU track materials from the manufacturer supplying the system around them

Sport Floor can prepare coordinated product packages for contractors and importers building professional athletics surfaces.

01

PU Manufacturing

Sport Floor manufactures a dedicated family of sports-flooring polyurethane materials.

02

Rubber Materials

EPDM and SBR/rubber materials can be included according to the selected track system.

03

Project Application

System decisions are supported by Sport Floor's sports-flooring project experience.

04

International Export

Material packages can be prepared for contractors, distributors and project buyers in overseas markets.

Request an accurate Full PU quotation

Send the track specification — not only the square metres

Track Area

Total square metres and project dimensions.

Required System

Confirm Full PU or send the specification if system selection is still open.

Base Type

Asphalt, concrete or planned civil-track construction.

Target Use

Competition, stadium, club, school, training or community athletics.

Layer / Thickness Spec

Send consultant drawings or material specification where available.

Color & EPDM

Provide required surface color and EPDM requirements where known.

Destination

Country, city and preferred port or delivery point for export.

Documents

TDS, SDS, packing, test or consultant-submittal requirements.

Full PU Running Track FAQ

Questions contractors and buyers ask before selecting Full PUR

What is a Full PU running track system?

Full PU / Full PUR is a dense in-situ synthetic track system in which the main resilient and wearing build-up relies heavily on polyurethane layers, typically combined with SBR and/or EPDM granules according to the selected system.

Is Full PU the same as Spray Coat?

No. Full PU is a polyurethane-rich dense system. Spray Coat typically uses a porous rubber base finished with a thinner sprayed PU/EPDM coating.

Is Full PU the same as Sandwich?

No. Sandwich systems normally use a resilient SBR/rubber base, pore sealer and dense PU upper layer. Full PU relies more heavily on dense polyurethane layers through the build-up.

Does Sport Floor manufacture the PU materials used in the system?

Yes. Sport Floor manufactures a dedicated range of polyurethane sports-flooring products including primers, binders, self-leveling PU, sealers, top coats, markings and related materials.

Does Sport Floor use German raw materials?

Yes. German raw materials are used within applicable Sport Floor polyurethane formulations.

What base is required for Full PU track surfacing?

The system requires a stable, correctly prepared base such as suitable asphalt or concrete according to the project and selected system specification.

How thick is a Full PU running track?

Thickness is system- and project-specific. Use the selected Sport Floor system specification and current technical documentation rather than a generic value.

Can Sport Floor supply EPDM and SBR with the PU materials?

Yes. A coordinated system quotation can include compatible PU materials and rubber granules according to the selected track build-up.

Is Full PU a World Athletics system category?

World Athletics certified surfacing lists use Full PUR as one recognized track-surface description. However, a system category does not mean every product is certified; certification must be verified for the exact product.

Does this Sport Floor page claim World Athletics certification?

No. Sport Floor should only claim World Athletics product or facility certification when current, specific certification evidence is available.

Can Sport Floor export Full PU running-track materials?

Yes. Contractors, distributors, importers and project buyers can request international material supply at info@sportfloor-m.com.

Can I request TDS and SDS?

Yes. Request current technical documents for the actual products included in your proposed system.

Full PU track system · German raw materials · manufacturer direct · global supply

Build the athletics track with a coordinated polyurethane system — not a collection of unrelated materials.

Send the track area, base, project specification, target use, required system, color and destination. Sport Floor can prepare a Full PU material package covering the compatible primer, polyurethane layers, rubber granules and related finishing materials.

Scroll to Top