PU Handball Surfaces for Schools, Clubs and Sports Facilities

Tartan Handball Court Systems and Polyurethane Court Surfaces

Plan a polyurethane handball court around the official playing dimensions, safety zones, goal areas, court markings, goals, supporting base and project-specific flooring performance. Request materials-only supply, technical support, supervision or an agreed installed-court scope.

40 × 20 m Handball Courts Indoor PU Sports Floors Outdoor Handball Courts School and Club Facilities Materials and Export Supply
Outdoor polyurethane handball court with goals and contrasting color zones
Handball Surface Overview

What Is a Tartan Handball Court?

A tartan handball court is a project-specific synthetic sports surface commonly constructed from polyurethane and compatible resilient materials over a prepared supporting base.

The word “tartan” does not define one universal flooring construction. A court may use a dense PU coating, a cushioned multi-layer floor, a rubber-based resilient layer or another approved synthetic system.

The final construction should reflect the facility level, indoor or outdoor environment, supporting base, expected loading, performance criteria, maintenance plan and required approval.

Select and compare the complete flooring system—not only the color, total thickness or description “PU handball surface.”
Handball court with two goals and synthetic sports flooring
01

Official Court Layout

Playing area, goal areas, safety zones and substitution areas must be planned together.

02

Defined PU Build-Up

Every primer, resilient layer, wearing layer and line material should be identified.

03

Goal Coordination

Goals, fixings, nets, protection and rear ball-stop systems form a separate equipment scope.

04

Measurable Performance

Friction, force reduction, deformation and ball rebound should use defined test methods where required.

Handball Facility Types

Indoor, Outdoor, School, Club and Multi-Sport Handball Courts

Indoor Handball

Sports Hall Facility

A complete indoor court coordinated with the building, lighting, seating, scorekeeping, goals and sports-floor requirements.

Outdoor Handball

External PU Court

A project-specific court designed around weather exposure, supporting levels, drainage and perimeter construction.

School Court

Education and Training Use

A facility planned for the school programme, age groups, available site and supervised use.

Club Court

Regular Training Facility

A court selected for regular team training, repeated use and an agreed maintenance programme.

Competition Court

IHF or Federation Requirements

A facility requiring confirmation of the exact competition, flooring approval, equipment and operational criteria.

Multi-Sport Court

Shared Indoor or Outdoor Area

A court combining handball with basketball, volleyball or other sports using a controlled line and color schedule.

Training Hall

Academy and Practice Use

A facility planned for repeated drills, equipment movement and intensive operational use.

Resurfacing

Existing Handball Court

A repair or overlay project selected after assessing the existing floor, adhesion, moisture, cracks and base movement.

Official Court Planning References

Handball Court Dimensions and Safety Zones

These values are key IHF planning references. Final construction must follow the current competition rules, floor regulations, local federation requirements and approved project drawings.

40 × 20 m Playing Court

Official indoor-handball playing rectangle.

44 × 22 m Minimum Safety Envelope

Derived from one metre along each side and two metres behind each goal line.

1 m Side Safety Zone

Minimum safety area outside each side line.

2 m Goal-Line Safety Zone

Minimum area behind each outer goal line.

3 × 2 m Internal Goal Size

Internal width and height of a standard handball goal.

6 m Goal-Area Line

Defines the goalkeeper’s goal area in front of each goal.

9 m Free-Throw Line

Broken line positioned three metres outside the goal-area line.

7 m Penalty Line

One-metre line positioned directly in front of the goal.

The `40 × 20 m` value covers the playing rectangle only. Do not place walls, fencing, benches, lighting columns, drainage channels or other obstructions inside the required safety and operational zones.
Official Handball Layout

Goal Areas, Free-Throw Lines and Court Markings

Side and Outer Goal Lines

Define the 40 × 20 metre playing rectangle.

Goal Line

The line between the goalposts is eight centimetres wide.

Other Court Lines

The remaining official markings are five centimetres wide.

Six-Metre Line

Forms the goal-area boundary using a central straight segment and curved sectors.

Nine-Metre Line

Broken free-throw line with equal 15-centimetre segments and gaps.

Seven-Metre Line

A one-metre solid line directly in front of each goal.

Four-Metre Line

A 15-centimetre goalkeeper restraining line in front of each goal.

Centre Line

Connects the midpoint of the two side lines.

Throw-Off Area

A four-metre-diameter central area where required by the applicable competition.

Substitution Lines

Coordinate the official substitution and coaching-zone arrangements.

Contrasting Colors

Use clearly visible line and zone colors against the main floor.

As-Built Survey

Record the completed line positions and equipment locations.

Final markings should be surveyed from the approved court drawing. They should not be copied visually from photographs or another facility.
IHF Floor Evaluation

Handball Flooring Performance and Test Requirements

The exact test scope depends on the facility and required approval. The values below summarize important criteria in the current IHF Floor Regulations and should be verified against the official document before tender submission or testing.

Performance PropertyIHF ReferenceProcurement and Testing Note
Force Reduction Ranges vary according to point-elastic, mixed-elastic, area-elastic or combined-elastic floor classification. Identify the exact floor category and test method before comparing results.
Vertical Deformation Limits differ between point-elastic and area or combined elastic systems. Total PU thickness alone does not establish deformation performance.
Ball Rebound Minimum reference of 90%, with uniformity requirements. Confirm the test ball, test method, locations and reporting procedure.
Dry Linear Friction Average reference range of 80 to 110. The exact finished surface and approved laboratory procedure must be used.
Wet Linear Friction Outdoor-venue average reference range of 55 to 110. Wet testing is relevant to outdoor exposure and must not be substituted with a generic slip claim.
Resistance to Wear Separate limits are provided for synthetic and coated or lacquered surfaces. Match the test classification to the exact proposed flooring.
Rolling Load Permanent indentation reference not exceeding 0.5 mm. Important where goals, seating, maintenance equipment or mobile loads cross the floor.
IHF Seal of Approval Applies to an identified floor that has completed the relevant IHF process. Do not describe every PU system or completed court as IHF approved.
EN 1177 is associated with impact-attenuating playground surfaces and should not be used alone as evidence that a floor complies with IHF handball-floor criteria.
Project-Specific PU Constructions

Handball Court Surface System Options

The final system should state the exact product references, individual layer thicknesses, planned consumption, substrate compatibility and performance documentation.

Dense Seamless Construction

PU Court Coating System

A project-specific polyurethane playing surface applied over a properly prepared and technically accepted base.

  • Compatible concrete or asphalt primer.
  • Approved repair and levelling materials.
  • Defined PU wearing construction.
  • Specified texture and color.
  • Compatible handball line paint.
Resilient Multi-Layer Floor

Cushioned PU Handball Court

A construction containing one or more specified resilient layers beneath the final playing surface.

  • Elastic layer type identified.
  • Individual thicknesses stated.
  • Sealing or levelling layer specified.
  • Required floor classification confirmed.
  • Performance tests defined before supply.
Rubber and PU Construction

Granule-Based PU Court System

A project-dependent system incorporating compatible rubber granules, PU binder and an approved upper surface.

  • Granule type and grading defined.
  • Binder compatibility confirmed.
  • Layer density and consumption stated.
  • Pore sealing included where required.
  • Indoor or outdoor suitability documented.
SBR and EPDM are not mandatory in every handball floor. They should be included only when they form part of the approved system build-up.
Court System Anatomy

Typical Layers in a PU Handball Court

The following sequence is a general procurement framework. The actual system may contain fewer or additional layers depending on the substrate, floor category and approved product construction.

The proposal should state every layer separately. Avoid quoting one total thickness without showing the materials that create it.
Synthetic handball court surface with goal-area markings
01

Structural Base

Concrete or asphalt providing support, dimensions and court geometry.

02

Surface Preparation

Cleaning, grinding and removal of weak or incompatible materials.

03

Repairs and Levelling

Approved treatment of local defects, cracks and irregularities.

04

Compatible Primer

Adhesion layer selected for the actual substrate.

05

Resilient Layer

PU, rubber, foam or another identified construction where used.

06

Sealing or Elastic PU

Pore sealer, levelling coat or dense elastic layer where required.

07

Playing Surface

Smooth, textured or another project-approved upper finish.

08

Court Markings

Compatible line paint applied to the approved handball layout.

Outdoor handball court with synthetic surface and perimeter fencing
Supporting Civil Works

Handball Court Base, Levels and Drainage

  • Confirm subgrade stability and compaction.
  • Complete the approved concrete or asphalt construction.
  • Survey the 40 × 20 metre court geometry.
  • Confirm the full safety-zone dimensions.
  • Review concrete curing and moisture conditions.
  • Assess cracks, joints and structural movement.
  • Remove oil, dust and incompatible coatings.
  • Coordinate outdoor slopes and drainage outlets.
  • Avoid water entrapment under dense PU systems.
  • Complete goal anchors and structural interfaces first.
  • Issue a formal base-acceptance record.
  • Protect the accepted base before surfacing.
Synthetic PU layers cannot permanently correct settlement, structural movement, trapped moisture, defective asphalt or incorrect drainage.
Handball Equipment

Goals, Nets, Fixings and Rear Ball-Stop Protection

Goal Dimensions

The internal opening is three metres wide and two metres high.

Goal Position

One goal is centred on each outer goal line.

Secure Fixing

Goals must be firmly fixed to the floor or the structure behind them.

Goal Frame

Posts and crossbar should comply with the specified dimensions, section and edge requirements.

Contrasting Bands

Visible goal-frame surfaces should use two contrasting colors.

Goal Net

The net should retain a normally thrown ball within the goal.

Additional Catch Net

A secondary internal net may be included where required.

Rear Ball-Stop Net

Coordinate the project-specific vertical protection behind each goal.

Goal-Line Interface

Coordinate frame placement with the eight-centimetre goal line.

Floor Protection

Prevent anchors, wheels or equipment movement from damaging the PU surface.

Inspection

Check fixing, dimensions, nets, frame condition and stability.

Approval Status

Verify the exact goal model before using any IHF approval claim.

Do not describe goals as IHF approved unless the exact supplied model carries the applicable documented approval or seal.
Environment and Facility Conditions

Indoor and Outdoor PU Handball Courts

Design PointIndoor Handball CourtOutdoor Handball Court
Supporting Base Commonly concrete, with detailed moisture, joint and level assessment. Concrete or asphalt with stable falls and drainage.
Moisture Review slab moisture and vapour before dense PU application. Prevent rainwater and perimeter moisture from entering beneath the system.
Drainage Control cleaning water and building-water incidents. Coordinate surface slopes, channels and outlets.
Floor Performance Confirm the required elastic-floor classification and applicable tests. Include dry and project-required wet surface evaluation.
Rolling Loads Consider retractable seating, goals and maintenance equipment. Consider movable goals and maintenance or event loads.
Weather Exposure Controlled by the building environment and operating conditions. Heat, rainfall and local environmental exposure must be assessed.
Material Suitability Verify indoor or outdoor suitability through the exact proposed material documents and tests.
Court Construction Workflow

Typical Tartan Handball Court Installation Process

1

Confirm the Facility Brief

Approve the intended use, competition level and supply scope.

2

Review Rules and Drawings

Confirm dimensions, safety zones, markings and equipment.

3

Complete the Site Survey

Check geometry, levels, drainage, access and obstructions.

4

Construct the Base

Complete the approved concrete, asphalt and drainage works.

5

Install Goal Interfaces

Complete anchors, fixings and rear protection before surfacing.

6

Accept the Base

Record moisture, levels, cracks, strength and cleanliness.

7

Prepare and Repair

Clean, grind and treat approved local defects.

8

Apply Primer

Use the specified product and approved application rate.

9

Install System Layers

Apply the approved resilient, sealing and PU construction.

10

Complete the Playing Surface

Apply the selected color, texture and finishing layer.

11

Set Out Lines and Goals

Paint the approved layout and complete goal installation.

12

Test and Handover

Complete the agreed inspection, testing and documentation scope.

Installation duration depends on the area, base condition, selected floor construction, curing, equipment, environmental conditions, testing and approval process. Avoid one fixed duration for every project.
Court Operations

PU Handball Court Maintenance and Resurfacing

Remove Loose Debris

Keep sand, dust and abrasive particles away from the floor.

Use Approved Cleaning

Follow the exact flooring supplier’s cleaning instructions.

Control Indoor Moisture

Respond promptly to leaks, standing water and cleaning incidents.

Maintain Outdoor Drainage

Keep channels, outlets and perimeter details clear.

Inspect High-Wear Zones

Review goal areas, centre court, entrances and team zones.

Inspect Court Lines

Repaint worn lines using compatible materials and accurate setting-out.

Check Delamination

Investigate bubbles, lifting or loss of adhesion promptly.

Protect Rolling Loads

Use appropriate load distribution for movable goals and equipment.

Inspect Goals and Nets

Review anchors, frames, nets and rear ball-stop protection.

Monitor Surface Friction

Investigate contamination or polishing where the court becomes excessively slippery.

Repair Local Damage

Use system-compatible repair products and procedures.

Resurface by Condition

Base resurfacing decisions on inspection and performance needs.

There is no universal three-, five- or eight-year lifespan for every PU handball court. Condition depends on the floor system, base, environment, loading, installation, cleaning and maintenance history.
Commercial Offer Checklist

Information Required for a Tartan Handball Court Quote

Required InformationWhat to ProvideWhy It Matters
Facility Type School, training, club, competition or multi-sport court. Establishes the court, floor and equipment requirements.
Indoor or Outdoor Building environment or external exposure conditions. Influences moisture, drainage and material selection.
Playing and Total Area Court dimensions, safety zones and total surfaced area. Required for material and layout calculations.
Supporting Base Concrete, asphalt or existing floor and its condition. Influences preparation, primer and repair scope.
PU System Consultant-specified floor or requested option comparison. Establishes layers, materials and quantities.
Floor Classification Point, mixed, area or combined elastic where applicable. Determines the applicable performance criteria.
Testing Requirements Force reduction, deformation, rebound, friction, wear or load tests. Defines documents, laboratory scope and acceptance.
Colors and Markings Playing area, goal areas, official lines and other sports. Required for material and line-paint planning.
Handball Equipment Goals, nets, fixings, rear nets and protection. Clarifies equipment and structural interfaces.
Supply Responsibility Materials, support, supervision, installation or turnkey work. Prevents commercial-scope differences.
Destination Country, city, port and final delivery location. Required for freight and logistics planning.
Delivery Term Incoterms® rule, named place and required delivery date. Defines delivery responsibilities, costs and risk.
Separate the commercial values for civil works, PU flooring, court markings, goals, nets, ball-stop protection, testing, installation, supervision and export delivery.
Frequently Asked Questions

Tartan Handball Court FAQ

What is a tartan handball court?

It is a project-specific synthetic handball surface commonly constructed using polyurethane and compatible resilient materials over a prepared base.

What are the official handball court dimensions?

The official indoor-handball playing court is 40 metres long by 20 metres wide.

How much total space is required around the court?

Applying the minimum one-metre side safety zones and two-metre zones behind the goals produces a minimum envelope of 44 by 22 metres.

What is the official handball goal size?

The internal goal opening is three metres wide and two metres high.

What are the six-, seven- and nine-metre lines?

The six-metre line defines the goal area, the seven-metre line is used for penalty throws, and the broken nine-metre line is the free-throw line.

How wide are handball court lines?

The goal line between the posts is eight centimetres wide. Other official court lines are five centimetres wide.

Can PU flooring be used for an IHF handball court?

A synthetic floor may be proposed when it meets the applicable project and IHF requirements. The exact product must be verified before making an IHF approval claim.

What performance tests apply to handball flooring?

Project requirements may include force reduction, vertical deformation, ball rebound, friction, resistance to wear and rolling-load testing.

Can a PU handball court be installed outdoors?

A project-specific outdoor system may be used when the materials, base, drainage and exposure conditions are suitable.

Does every PU handball court use SBR and EPDM?

No. Materials depend on the approved flooring construction and may use different PU, rubber, foam or resilient layers.

Are handball goals included in the flooring quotation?

Only when the quotation expressly includes goals, nets, anchors, fixings, ball-stop protection and installation.

Can an existing handball court be resurfaced?

Resurfacing may be possible after assessing the existing floor, adhesion, cracks, moisture, movement and compatibility.

How long does a tartan handball court last?

Service condition depends on the flooring system, base, environment, use, loading, installation and maintenance. There is no universal fixed lifespan.

How is tartan handball court pricing calculated?

Pricing depends on total area, base condition, system layers, required tests, markings, goals, installation, documentation, destination and delivery term.

Request a Tartan Handball Court Quotation

Send the facility type, playing and total area, indoor or outdoor environment, supporting base, required floor classification, PU system, test requirements, colors, markings, goals, supply scope, destination and Incoterms® rule.

Tartan Handball Court PU Surface & Court Supply

If you’re planning to build a new handball court or renovate an existing surface, Sport Floor provides a complete, turnkey solution:
– Engineering design tailored to international standards
– Certified materials manufacturing with premium quality control
– Reliable supply and worldwide shipping
– Direct factory warranty for full peace of mind
Our proven systems are trusted and exported to 47 countries worldwide.
📩 Send us your project area (m²) and installation location (city/country) today —
and receive a preliminary technical proposal within 72 working hours.